Wooden model ship kit · 1:90

HMA Submarine AE1/AE2

The Royal Australian Navy's first submarines, commissioned in 1914.

Skill

Intermediate

Finished length

630 mm

260 mm tall

Scale

1:90

For builders with a kit or two behind them. New to wooden ships? Start with a beginner kit.

$286.00 AUD

Taxes included · Kit KTMS1018

Sold out. Being made now

Join the wait list and we'll email you the day it's ready to ship.

We'll email you when it's back, and send news about new kits and restocks. Unsubscribe any time.

Want to start building now? See kits that ship tomorrow
  • Next-day dispatch
    2–4 days in Australia
  • Parts replaced free
    within 30 days
  • 14-day returns
    on unstarted kits
  • Read the instructions
    before you buy

Buying it as a gift? Add a message in the cart. We ship worldwide; international import duties are paid on delivery unless checkout shows them included. Shipping details

About this kit

AE1 and AE2 were Australia's first submarines: two E-class boats built in England and commissioned into the Royal Australian Navy in 1914. The kit is built the traditional way, planked over bulkheads, so you shape the hull yourself.

At 1:90 scale the model is 630 mm long. It's an Intermediate level kit, a good next step for builders with a kit or two behind them. Name plates for both boats are included, so you can finish yours as either AE1 or AE2.

Download the building instructions (PDF, version 2.0)

What's in the box

  • Laser-cut parts you shape and fit
  • All the timber and rigging cord the model needs
  • A complete set of fittings
  • Two name plates, to build the model as AE1 or AE2
  • English instructions on large A3 pages, with full-colour photographs of every stage

Tools, glue and paint are not included.

Kit specifications

  • Scale: 1:90
  • Length: 630 mm
  • Width: 80 mm
  • Height: 260 mm
  • Skill level: Intermediate
  • Code: KTMS1018

More naval history in our range: wooden warship model kits.

The ship's story

AE1 and AE2, Australia's first submarines 1914

AE1 and AE2 were Australia's first submarines, two E-class boats built in England for the new Royal Australian Navy. AE1 vanished off New Guinea in Australia's first major loss of the war, and her wreck was not found until December 2017. AE2 became the first submarine to force the Dardanelles into the Sea of Marmara, the only RAN vessel lost to enemy action in the First World War.

  1. 24 May 1914

    AE1 and AE2 reach Sydney from England, completing what is at the time the longest voyage ever made by a submarine.
  2. 14 September 1914

    The day after the surrender of Rabaul, AE1 leaves Blanche Bay at 7 am to patrol off Cape Gazelle with HMAS Parramatta and never returns. She is declared lost with all 35 men aboard, most likely after striking a reef or other submerged hazard.
  3. 25 April 1915

    At 2:30 am on the day of the Gallipoli landings, AE2 under Lieutenant Henry Stoker makes her second attempt on the Dardanelles. Fired on from shore and picking her way through mine cables, she reaches the Sea of Marmara with orders to "run amok".
  4. 30 April 1915

    After five days of attacks hampered by mechanical trouble, AE2 is holed by the torpedo boat Sultanhisar. Stoker scuttles her at 10:45 and the whole crew is captured, four of whom later die in captivity.
  5. 11 June 1998

    Marine archaeologist Selcuk Kolay finds AE2 on the floor of the Sea of Marmara. The Australian and Turkish governments later agree to leave her where she lies, the last tangible relic of that campaign.

Built by our customers

HMA Submarine AE1/AE2, as our customers built it

Real builds, shared online by the people who made them. Tap a photo to see it larger.

A model you'll want a shelf for

Finished, this model is 630 mm long and 260 mm tall at 1:90 scale. Measure your shelf or display case before you start.

Scale
1:90
Length
630 mm
Width
80 mm
Height
260 mm
Skill level
Intermediate
Kit code
KTMS1018

What you get, and what you'll need

In the box

  • Precision laser-cut parts you shape and fit
  • All the timber and rigging cord
  • A complete set of fittings
  • English instructions with full-colour step-by-step photographs on large A3 pages

You'll also need

Tools, glue and paint aren't in the box. Most builders work with:

  • A sharp hobby knife and sandpaper
  • Tweezers, and a few clamps or pegs
  • Wood glue
  • Paint and brushes

All easy to find at a hobby or hardware store. Read through the instructions first so you know what each stage needs.

See the instructions first

Cover of the HMA Submarine AE1/AE2 building instructions

Every stage is photographed in full colour. Download the whole manual and see exactly what the build involves.

Before you buy

Questions about the HMA Submarine AE1/AE2 kit

Still deciding?

Ask the people who design and make the kits. We'll tell you honestly which one suits your experience.

Ask us a question

The kit

What's included, and what do I need to buy separately?

Every laser-cut part, all the timber, the rigging cord, a full set of fittings and A3 colour instructions are in the box. You'll need your own tools, glue and paint.

Can I see the instructions before I buy?

Yes. The full building instructions are a free PDF download, so you can see every stage of the build before you order. Download the instructions

Ordering and delivery

How fast is shipping?

Orders are dispatched the next business day. Delivery takes about 2 to 4 business days in Australia and 6 to 10 internationally.

What if a part is missing or broken?

We replace missing or broken parts within 30 days of purchase. Unstarted kits can be returned within 14 days.

Can I send it as a gift?

Yes. Add a gift message in the cart and we'll include it with the kit.